Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Communications announces the start of installing light beams for the Baghdad metro project

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 278598
    Join date : 2012-12-21

    Communications announces the start of installing light beams for the Baghdad metro project Empty Communications announces the start of installing light beams for the Baghdad metro project

    Post by Rocky Sat 07 Aug 2021, 7:43 am

    Communications announces the start of installing light beams for the Baghdad metro project

    [You must be registered and logged in to see this image.]




    The Ministry of Communications announced, on Saturday, that it has started the installation of light beams for the companies implementing the (Baghdad Metro) project within the Rusafa side, whose task is to control the Internet capacities entering the country centrally through optical cables at very low costs, which stops the smuggling of capacities, and will end the random extension of optical cables. Virtual.
    The Director of Relations and Media in the Directorate of Rusafa Communications Bassam Jabbar Muhammad said, "The installation work for the packages implemented by the technical and engineering staff of the Directorate, will extend from the Jadiriyah switch to the headquarters of the main center for optical cable in Karrada within the metro project, after conducting a site inspection of the switch to start installing its devices. “.
    He added that "the directorate is working to overcome all obstacles to passing the capacities of the metro project, to ensure the stability of the service provided to citizens and institutions benefiting from its services," revealing that "the directorate has completed the work of linking one of its sites optically within the proactive plan prepared for the aforementioned project."
    Muhammad revealed that “a malfunction occurred in the path (Upper - Al-Sinak) caused by the excavations of the service departments in the Karrada area, which is one of the optical cable paths within the project of the optical access network (metro) with a capacity of 48 hairs in the path linking the upper and Al-Sinak exchanges, and the pieces were identified by a maintenance authority. The optical cable with an OTDR device.
    [You must be registered and logged in to see this link.]

      Current date/time is Sat 05 Oct 2024, 4:14 pm