Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Achieving advanced accomplish Industrial City project in Dhi Qar ratios

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 280306
    Join date : 2012-12-21

    Achieving advanced accomplish Industrial City project in Dhi Qar ratios Empty Achieving advanced accomplish Industrial City project in Dhi Qar ratios

    Post by Rocky Wed 29 Jun 2016, 8:42 am

    [You must be registered and logged in to see this link.]
    Project industrial city in Dhi Qar
    Achieving advanced accomplish Industrial City project in Dhi Qar ratios


    Author: AR, HH 
    Editor: AR, HH 6.29.2016 12:44 Number ofViews: 492 



    Long-Presse / Baghdad
    The Ministry of Industry and Minerals of Iraq, on Wednesday, for the achievement of an advanced project of a complete industrial city in the province of Dhi Qar ratios, while confirming that the second phase included the construction of a bank and sewage plants and a network of electricity.
    The director of the Information Center and Public Relations at the Ministry Abdul Wahid Alwan al-Shammari, in a statement received (range Press) copy of it, "the General Company for the design and implementation of projects completed more than 80% of the construction of the industrial city in Dhi Qar in the implementation of the second phase."
    Shammari said, "The work included the creation of a unit water filter and construction of roads and modern buildings including banks and building workshop for Civil Defence, a restaurant and a workshop for Transport and the creation of networks of water and sewer for rain water and network power supply and lighting, mobile unit for wastewater treatment plants, as well as pumping station rainwater."
    The first phase was the building include the establishment of bunk management and the establishment of a fence industrial city length of 3 km and the main gate of the city of Foreign queries and networks of electricity, telephone and water networks, sewage and create a water tank.


    [You must be registered and logged in to see this link.]
    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 280306
    Join date : 2012-12-21

    Achieving advanced accomplish Industrial City project in Dhi Qar ratios Empty Industry Announces ratios advanced completion of a draft industrial city in Dhi Qar

    Post by Rocky Wed 29 Jun 2016, 8:50 am

    [ltr]
    [size=48]Industry Announces ratios advanced completion of a draft industrial city in Dhi Qar


    June 29, 2016


    [size=14][You must be registered and logged in to see this link.]
    [/size]
    [/ltr][/size]
    [ltr]
    [You must be registered and logged in to see this link.]
    Our economy / Baghdad
    The Ministry of Industry and Minerals of Iraq, on Wednesday, for the achievement of the completion of an advanced project of a industrial city in the province of Dhi Qar ratios, while confirming that the second phase included the construction of a bank and sewage plants and a network of electricity.
    The director of the Information Center and Public Relations at the Ministry Abdul Wahid Alwan Shamari said in a statement received by the agency of our economy News, a copy of which, "The General Company for the design and implementation of projects completed more than 80% of the construction of the industrial city in Dhi Qar in the implementation of the second phase."
    Shammari said, "The work included the creation of a unit water filter and construction of roads and modern buildings include bank and building workshop for Civil Defence, restaurant and workshop Transport and the creation of networks of water and sewer for rain water and network power supply and lighting, mobile unit for wastewater treatment plants, as well as pumping station rainwater"


    [You must be registered and logged in to see this link.]
    [/ltr]

      Current date/time is Tue 05 Nov 2024, 3:29 pm