Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Join the forum, it's quick and easy

Established in 2006 as a Community of Reality

Welcome to the Neno's Place!

Neno's Place Established in 2006 as a Community of Reality


Neno

I can be reached by phone or text 8am-7pm cst 972-768-9772 or, once joining the board I can be reached by a (PM) Private Message.

Established in 2006 as a Community of Reality

Would you like to react to this message? Create an account in a few clicks or log in to continue.
Established in 2006 as a Community of Reality

Many Topics Including The Oldest Dinar Community. Copyright © 2006-2020


    Pictures .. Opening architecture suspension bridge 377 meters long

    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 281148
    Join date : 2012-12-21

    Pictures .. Opening architecture suspension bridge 377 meters long Empty Pictures .. Opening architecture suspension bridge 377 meters long

    Post by Rocky Fri 20 Jan 2017, 1:45 am

    [ltr]Pictures .. Opening architecture suspension bridge 377 meters long[/ltr]

    [ltr][You must be registered and logged in to see this image.]
    Maysan - Iraq Press - January 20: opened the local government, in Maysan province, the official and popular presence Bridge architecture commentator on the Tigris River in the city of Amara , the county seat.


    It was the foundation stone of the bridge put in early April 2012 and opened Thursday.


    The bridge connects the Tigris Street and Corniche Serail near the province of Maysan , a building area of traditional dance and street Baghdad , the president, to help alleviate traffic congestion after increasing the number of vehicles and population expansion within the province.


    The total length of the bridge is 377 meters and a width of a total of 30 meters, is concentrated in the middle tower iron oval with a total height 49 meters, represents a key intermediate stent - bearing bridge by 44 wire of steel, and the length of the mobile bridge this pillar of 143 meters, has two lanes for the passage of vehicles back and forth 7m wide, in addition to the side of pedestrian width of 3 meters, and a carrot and an average width of 3 meters, and fishing platforms from both sides.


    The cost of the bridge create more than 27 billion dinars (about 23 million US dollars), within the development of the regions of the 2012 allocations.


    The bridge carried out by a company (lights Syrian) Iraqi and completed his designs one of the offices of the Consulting Engineers in cooperation with the German Office for Engineering Consultancy.


    It was the iron structure of the bridge tower manufacturing and commentary in China and shipped to Iraq nautical shaped parts were the work done by the Chinese cadre for implementation. Q ended


    [You must be registered and logged in to see this link.]



    [You must be registered and logged in to see this link.]




    [You must be registered and logged in to see this link.]



    [You must be registered and logged in to see this link.]



    [You must be registered and logged in to see this link.]

    Share this topic:




    [You must be registered and logged in to see this link.]

    [/ltr]
    Rocky
    Rocky
    Admin Assist
    Admin Assist


    Posts : 281148
    Join date : 2012-12-21

    Pictures .. Opening architecture suspension bridge 377 meters long Empty Maysan opens commentator bridge at a cost of 27 billion dinars and relies investment to cope with au

    Post by Rocky Fri 20 Jan 2017, 1:58 am

    [You must be registered and logged in to see this link.]
    Maysan opens commentator bridge at a cost of 27 billion dinars and relies investment to cope with austerity


    Author: AAW, AHF 
    Editor: AHF 
    01.19.2017 18:33 
    Number of Views: 2596


    Long-Presse / Maysan
    It announced the Maysan Provincial Council, on Thursday, the opening of the palace bridge after the completion of linking the bridge road service leading the process to Spring neighborhood to the east and Avenue of the Tigris from the opposite side, and in what was described the project as "the first at the level of the southern region of Modern designed according to the system (Cable Ostep)" , he confirmed that Maysan became superior service to its undertakings and its dependence on investment to cope with austerity.
    The deputy chairman of the Council of Maysan province Jawad Rahim al-Saadi, said in an interview to the (long-Presse), "it was the opening of a bridge Serail commentator continuous efforts by the local government, which paid great attention to the completion of work on the bridge as a link to the east of the province Street and Tigris Corniche Serail direction spring neighborhood, "noting that" this project is the first at the level of the southern region of modern designed according to the system (Cable Ostep). "
    Saadi added that "the government is still continuing to work despite the economic crisis, which has become a stumbling block in the way of completing hundreds of projects," pointing out that "the municipality of architecture carried out the rest of the acts that disrupted the opening of the bridge on schedule Kalthblat connectivity and the creation of moderation, lighting, landscaping and art touches carrot" .
    In turn, Chairman of the Investment Committee in the Maysan province Mohammad Hilfi said in an interview with (long-Presse), "The cost of the bridge amounted to more than 27 billion dinars, with a length of more than 300 meters and a two-lane for cars and aisle width 3 meters on either side of the road with a carrot centrist and bow pregnant the bridge, which has a height of more than 100 meters. "
    Hilfi added that "Maysan has become superior to its undertakings service, and we have a comprehensive investment plan to improve the investment sector, which represents the only way for the completion of projects under the current circumstances experienced by the country due to austerity", adding that "the development in all countries of the world back to rely on companies that operate investment system and this is what the Council will do during the next phase. "
    Serail Bridge and longer cycle of construction and reconstruction rings experiencing Maysan, the first in the southern region in terms of modernity and design in terms of building bridges modern and sophisticated and designed according to the system (Cable Ostep). "

    [You must be registered and logged in to see this link.]

      Current date/time is Sat 23 Nov 2024, 10:52 am